By Demar BonnemereThe paving is complete. The remaining items include signal loop installation in the pavement, curb ramp construction, roadway final striping, and shoulder grading. Nightly lane... |Announcement, Newswire
By Demar BonnemereThe Katharine Stinson Dr. Extension, west of Broughton Hall, will be closed from August 14, 2023, to October 2026 as construction of the Integrative Sciences... |Announcement, Newswire
By Demar BonnemereAugust 7 -The left lane of eastbound I-440, from I-40 to Jones Franklin Road, will be closed from 9 p.m. to 5 a.m. (TENTATIVE) -The... |Announcement, Newswire
By Demar BonnemerePer the City of Raleigh: Beginning this Sunday night and running through Friday, Aug. 11, the City of Raleigh will be re-striping the bike lanes on Hillsborough... |Announcement, Newswire
By Demar BonnemereThe paving is complete. The remaining items include signal loop installation in the pavement, curb ramp construction, roadway final striping, and shoulder grading. Nightly lane... |Announcement, Newswire
By Demar BonnemereJuly 31 -Hillsboro St. Flagging Operations from 9 p.m. to 5 a.m. (See attached Hillsborough St. Ramp D Detour and WB Hillsborough St. Detour Maps.)... |Announcement, Newswire
By Demar BonnemereThe final pieces of the HVAC unit being installed at the Venture IV building will be on August 4-6. This will result in the closure... |Announcement, Newswire
By Demar BonnemereThe paving is complete. The remaining items include signal loop installation in the pavement, curb ramp construction, roadway final striping, and shoulder grading. Nightly lane... |Announcement, Newswire
By Demar BonnemereOn Friday, July 28, the parking spaces on Cates Avenue, facing Derr Track across from the Coliseum Deck, will be resurfaced. This project is expected... |Announcement, Newswire
By Demar BonnemereThe Wolfline fall schedules and route map are now available. There will be 10 weekday routes from 7 a.m. to 1 a.m. and three weekend...