Upcoming Road Work on Avent Ferry Rd. & Western Blvd., July 30-August 3

The paving is complete. The remaining items include signal loop installation in the pavement, curb ramp construction, roadway final striping, and shoulder grading. Nightly lane closures for this week include:

Western (I-440 to Central Prison) – Curb Ramp and Inductive Loop Work (8 pm6 am)

  • Sunday (July 30)
    • Left and right lane closures to install inductive loop wire for signal loops along eastbound and westbound Western Boulevard.
    • Right lane closures for curb ramp work along eastbound Western Boulevard.
  • Monday (July 31)
    • Left and right lane closures to install inductive loop wire for signal loops along eastbound and westbound Western Boulevard.
    • Right lane closures for curb ramp work along eastbound Western Boulevard.
  • Tuesday (August 1)
    • Left and right lane closures to install inductive loop wire for signal loops along eastbound and westbound Western Boulevard.
    • Right lane closures for curb ramp work along eastbound Western Boulevard.
  • Wednesday (August 2)
    • Left and right lane closures to install inductive loop wire for signal loops along eastbound and westbound Western Boulevard.
    • Right lane closures for curb ramp work along eastbound Western Boulevard.
  • Thursday (August 3)
    • Left and right lane closures to install inductive loop wire for signal loops along eastbound and westbound Western Boulevard.